Built Better,
Built Faster

Cleantech meets housing. Sustainability isn't a feature. It's the natural result of building smarter.

4 wksFaster to framingvs. conventional stick-frame timeline
−30%Less material wasteprefab vs. site-cut framing
16Units in inner Calgarybuilt and under construction

Sustainability Is
Built Into the Process

Build Where Infrastructure Exists

Every MASIV project is on existing city infrastructure: roads, water, sewer, transit. No greenfield sprawl. No new trunk lines. The environmental cost of infrastructure is already paid.

Design Only What the Site Needs

Parametric design in Superstudio means we test dozens of configurations before committing to one. Every unit earns its floor plate. No over-engineered buildings, no wasted programme.

Reduce Waste Before Construction Starts

Prefab framing means material is cut to exact specification in a controlled environment, not on a muddy job site. Off-cuts are reused. Waste volumes are a fraction of conventional stick-frame.

Deliver Where People Already Thrive

MASIV targets inner-city Calgary: established neighbourhoods with walkable amenities, frequent transit, and employment density. The residents we house don't need a car. That's an environmental outcome, not just a lifestyle one.

Build High-Performance Envelopes

Prefab wall panels are built to tighter tolerances than site-cut framing: better air sealing, better insulation continuity, better thermal performance. Lower operating energy from day one.

Create Attainable Long-Term Rental

When we hold as rental, we're not flipping units for short-term yield. We're adding to Calgary's permanent rental stock near transit and jobs: housing that stays affordable because it stays in supply.

Factory Precision,
Field Speed

A conventional stick-frame build generates material waste because cuts are made on-site without full coordination. Material is ordered in excess. Off-cuts are discarded.

MASIV's prefab panels are cut to exact specification in a controlled environment. The Superstudio model drives the cut list: nothing is ordered that isn't needed, nothing is cut that doesn't go into the building.

Material wasteConventional: ~30% industry averageMASIV: Cut-to-spec, minimal off-cuts
Site disturbanceConventional: Weeks of framing on-siteMASIV: Days, with panels arriving in sequence
Air sealingConventional: Variable, depends on site conditionsMASIV: Controlled, consistent in factory
Labour hoursConventional: High: site-intensive framingMASIV: Reduced: assembly, not fabrication

16 Units In.
More Coming.

Every project we deliver is one more proof point that faster, leaner, and more sustainable housing is possible right now, in Calgary's inner city.