Superstudio

Housing's operating system. One platform connecting land analysis, parametric design, permit drawings, prefab coordination, and construction intelligence.

Explore Superstudio.fit →

One System,
Every Phase

Superstudio was built by MASIV to solve a problem the market hadn't solved: a single platform that connects every phase of housing delivery, from the first land analysis to the last construction punch list.

The result isn't just faster design or better drawings. It's a system where every decision in one phase informs every decision in the next, with no data loss and no re-entry between teams.

Land + Urban Analysis
Design in 3D
Permit-Ready Drawings
Prefab Coordination
MEP Coordination
Construction Intelligence

Six Modules

Land + Urban Analysis

Score parcels on zoning capacity, infrastructure quality, transit proximity, and rental demand. Know if a site works before you make an offer.

Design in 3D

Parametric design tools tuned for infill typologies. Iterate across floor plans, heights, and unit mixes in hours, not weeks.

Permit-Ready Drawings

Automated drawing packages that meet municipal standards. Permit submission within weeks of design sign-off, not months.

Prefab Coordination

Panel cut lists, sequencing schedules, and shop drawings generated directly from the design model. Materials arrive pre-cut, pre-drilled, ready for assembly.

MEP Coordination

Mechanical, electrical, and plumbing rough-ins coordinated in 3D before site work begins. Eliminates field conflicts. Compresses schedule by weeks.

Construction Intelligence

Real-time tracking of schedule, cost, and material usage across all active projects. Every build feeds the dataset that makes the next one faster.

The System Gets
Smarter Every Build

Build 1
1836 Capitol Hill

Baseline data. Permit in 6 weeks.

Build 2
517 Chinook

Prefab sequencing refined. 3 weeks saved.

Build 3+
724 & 2315

MEP conflicts eliminated before site.

Platform First,
Builder Second

Superstudio isn't just internal tooling. It's a platform being extended to other developers, builders, and municipalities who want to move faster.